Behind the Meter Power

Interconnection queues eliminated entirely

Permitting processes streamlined through established regulatory relationships

Fully redundant design with multiple independent generation trains

Redundant fuel supply including onsite storage for up to Tier IV continuity

No dependence on transmission capacity or grid dispatch priority

Protected from the cascading instability of intermittent-heavy grid operators

Eliminates interconnect, capacity, and transmission cost layers

EPC pricing is all-in — no hidden escalators or ancillary charges

BTM contracts are all-in and fixed with gas adder — grid pricing shifts unpredictably with load step changes

Aprium owns and operates assets, directly aligning our incentives with customer outcomes

Repeatable modular process: 300 MW frame blocks and 20 MW reciprocating engine blocks

Water infrastructure expertise enables development in constrained locations

BTM generation has no effect on community electricity pricing

Backup capacity can be interconnected as peaking units as regulations allow, benefiting the broader grid